• Geohydrologisch onderzoek Scholengemeenschap Bonaire

    Geohydrological survey of the site Bonaire Comprehensive School (SGB)

    Client

    Rijksdienst Caribisch Nederland

    Year

    2015

    Flooding occurs on the site during periods of heavy rainfall. The following work was carried out in order to...

  • Geotechnisch onderzoek RIMA steiger

    Geotechnical survey of RIMA-pier Parera Naval Base

    Client

    Heuvelman Ibis

    Year

    2014

    Work carried out: Heavy cone penetration tests were carried out at 21 locations on the water from...

  • bouwlocatie HNO ziekenhuis

    Concrete quality control, nuclear soil density testing & monitoring of heat development, construction site of HNO Hospital

    Client

    Ballast Nedam

    Year

    2014

    Work carried out: Performing of concrete quality control for pouring of concrete in-situ...

  • CEGE referentie Windmolenpark Urirama

    Geotechnical survey of the Unirama Wind Farm’s foundations

    Client

    WARE

    Year

    2012

    Work carried out: Three cone penetration tests (DPTs) were carried out for each foundation. Based on...