Client:

WARE, 2012

Occasion:

Construction of new windfarm

Island:

Aruba

Geotechnical survey of the Unirama Wind Farm’s foundations

Work carried out:

  • Three cone penetration tests (DPTs) were carried out for each foundation.
  • Based on the results of the DPTs, twelve SPT bore holes combined with core bore holes were carried out to approx. 15 m -mv), including sampling and classification
  • Samples were transported to Curaçao for the implementation of Point Load and Compressive Strength tests in the laboratory