Client:
WARE, 2012Occasion:
Construction of new windfarmIsland:
ArubaGeotechnical survey of the Unirama Wind Farm’s foundations
Work carried out:
- Three cone penetration tests (DPTs) were carried out for each foundation.
- Based on the results of the DPTs, twelve SPT bore holes combined with core bore holes were carried out to approx. 15 m -mv), including sampling and classification
- Samples were transported to Curaçao for the implementation of Point Load and Compressive Strength tests in the laboratory