Client:
Civil Engineering Caribbean NV, 2011Occasion:
Road reconstructionIsland:
BonaireBonaire Roads inventory
The project area consisted of most surfaced and some unsurfaced roads on Bonaire. An overall cost estimate was compiled based on the overall picture of the technical condition of the roads.
Work carried out:
- Application of road barriers including applications for traffic permits
- Placing of around 400 bore holes in the road surface and underlying foundations
- Compilation of descriptions of bored-out materials
- Determine construction composition of asphalt: top layer, grading, binder, impregnation