Curious about our work?
Check out our great projectsReference projects
-
Pollution risk assessment Curaçao and Klein Curaçao coast
Client
Ministry of Health, Environment & NatureYear
2017
The survey is conducted in response to the observation of oil residues washed up on the north coast of...
-
Air and dust pollution survey of asbestos, house on Bonaire
Client
Fundashon Cas BonairianoYear
2017
Commissioned by FCB, CEGE performed an asbestos inventory of the distribution area, in response to a fire in...
-
Environmental soil survey Curoil depot Hato (Bonaire)
Client
Curoil N.V.Year
2017
The soil survey was carried out in response to and in accordance with the conditions set out in the company...
-
Asbestos inventory Curaçao Drydock
Client
Curaçao Drydock / Damen Shiprepair CuraçaoYear
2017
The inventory included almost all structures on the CD-site, as well as an inspection of the ground surface....
-
Quality control works by extension Wind farm Tera Kora
Client
NuCuraçao WindparkenYear
2017
In August 2016 NuCuraçao Windparken began the expansion of the wind farm Tera Kora with five new wind...
-
Air and dust pollution survey after asbestos fire Sentro Pro Arte
Client
Ministry of Health, Environment & NatureYear
2016
After the outbreak of a fierce fire in the empty building of Sentro Pro Arte at the Schouwburgweg, it was...
-
Environmental soil and groundwater survey Asphalt Lake
Client
Buskabaai N.V.Year
2016
The Asphalt Lake on Curaçao represents an environmentally unfriendly legacy of the Second World War. During...
-
Asbestos inventory edifice Curaçao
Client
Ministry of Education, Science, Culture and SportYear
2016
The inspection involved the interior and exterior of an edifice build in 1965. In the years 1960 to 1970,...
-
Geohydrological survey of the site Bonaire Comprehensive School (SGB)
Client
Rijksdienst Caribisch NederlandYear
2015
Flooding occurs on the site during periods of heavy rainfall. The following work was carried out in order to...
-
Asphalt quality survey, various road sections
Client
CWM-MNO B.V.Year
2015
Following the laying of new asphalt surfacing on various roads in Curaçao CEGE undertook an survey of the...
-
Environmental soil survey at the Courtyard Marriott development site
Client
Heren2CaribbeanYear
2015
During the geotechnical survey at the site of this future hotel, a high level of mineral oil contamination...
-
Geotechnical survey of RIMA-pier Parera Naval Base
Client
Heuvelman IbisYear
2014
Work carried out: Heavy cone penetration tests were carried out at 21 locations on the water from...